Last bulkhead & stem installed
Straightforward assembly but with two sensitive moments.
The stem, even though held in position by stem supports and bulkhead 9, is still prone to shift a bit. If unnoticed that can result in skewed installation.
I eyeballed the final position and checked with a long straight edge before leaving epoxy to set.
Horizontal batten, if glued to bulkhead 9 prior installation as called out in plans, will make mounting bulkhead 9 on the jig impossible. This batten locks into rectangular openings in longitudinal bulkheads (flotation tanks) so with it mounted already on bulkhead 9 one cannot tilt the assembly to slide onto the jig.
I noticed that when dry-fitting the bulkhead.
Much easier if this batten is mounted after the bulkhead 9 is installed.
Next step is making the keel timber.