Garboard no.2
It’s so hot during the day that the only thing I do, after coming back from The Mine, is to take a nap and wait for the evening. Too warm to attempt any serious epoxy work (pot life drastically shortens).
I was tinkering with stem bevel, to match already mounted garboard no.1.
Garboard no.2 needed some beveling on the meeting edge, to close the joint between edges of both planks. Cabinet-maker style joinery with rolling bevels. Totally unnecessary here as all this will be trimmed and covered with false keel but I just had fun doing it.
As garboards cover the entire keelson I needed to re-establish centerboard case opening and skeg’s mortises. Done with a small router.
Final fit of the second garboard. Learning where clamps need to go to close all gaps.
I’m leaving the plank clamped for the night, so that it “gets used to” to twist & bend in stem section